- Performing geotechnical supervision during the construction of the new railway from “Beljakovce” to “Kriva Palanka” (2002 – 2003). (Client – PE “Macedonian Railways” – Skopje).Performing geotechnical supervision during the construction of the dam “St. Petka ”(Matka – II) in the period from 2004-2006 and 2008-2010. (Client – “ESM” – Skopje).
Performing geotechnical supervision during the performance of geotechnical investigation for reconstruction of the railway “Tabanovce – Kumanovo” and “Dubrovo – D. Kapija” (2007). (Client – PE “Macedonian Railways” – Skopje).
Performing geological supervision during the performance of geological investigations on the coal deposit “Negotino” (2009). (Client – “Ministry of Economy” – Skopje).
Performing geological supervision during the geological investigations of the coal deposit “Mariovo” (2009 – 2010). (Client – “ELEM” – Skopje).
Performing geotechnical supervision during the construction of the road “Shavnik – Grabovica” (10 km), R. of Montenegro (2009-2010). (Client – “Traffic Directorate” – Podgorica).
Performing geological supervision during the performance of geological investigations on the coal deposit “Brod Gneoteino” (2014 – 2015). (Client – “ELEM” – Skopje).
Performing expert supervision during the realization of the additional injection works on the dam “Kozjak” (2015). (Client – “ELEM” – Skopje).
Performing geological supervision during the geological investigations of the coal deposit “Lavci” (2016). (Client – “ELEM” – Skopje).
Performing geological and geotechnical supervision during the performance of geological and geotechnical investigations for recategorization of coal reserves “Brod Gneoteino” (2017 – 2018). (Client – “ELEM” – Skopje).
Geotechnical investigations and field investigations along the route (14.5 km) and at locations of viaducts, underpasses, overpasses and tunnels on Corridor “K-8”, section: D. Bair – Kriva Palanka” for preparation of Elaborate at the level of the Main Project (2001-2002). (Client – “Balkan Consulting” – Skopje).
Geotechnical investigations and field investigations along the routes and at locations of bridges, viaducts, underpasses and overpasses on corridor “K-8”, sections: Gostivar – G. Gjonovica ”(17 km) and G. Gjonovica – Bukojchani ”(13 km) for the preparation of Elaborate at the level of the Main Project (2001-2002). (Client – “Balkan Consulting” – Skopje).
Geotechnical investigations and field examinations of locations on bridges on the corridor “K-8”, sections: “Bukojchani – Kichevo” for the preparation of Elaborate at the level of the Main Project (2001-2002). (Client – “Balkan Consulting” – Skopje).
Geotechnical investigations and examinations along the route of the railway “Dlabochica-D. Bair ”(22 km) for the preparation of an Elaborate at the level of a Preliminary Design (2002). (Client – “Balkan Consulting” – Skopje).
Geotechnical investigations and field examinations at the location of the dam “Blato” – Kavadarci for the preparation of an Elaborate at the level of the Main Project (2002). (Client – PE “Tikveshko Pole” – Kavadarci).
Detailed engineering geological investigations and examinations on an area of 471 km2 for preparation of Basic Engineering Geological Map of Macedonia for sheet: Kichevo (phase 2003) with preparation of Annual Report and Detailed engineering geological investigations and examinations on an area of 110 km2 for preparation of Basic engineering geological map of Macedonia for sheet: Kratovo (phase 2003) with preparation of the Annual Report. (Client – “Geing” – “Ministry of Economy” – Skopje).
Geotechnical investigations and field examinations along the route of the highway “M-6”, “Shtip-Strumica” from km 42 + 700 to km 52 + 700 for preparation of an Elaborate at the level of the Main Project (2003-2004) (Client – “Balkan Consulting” – Skopje).
Geotechnical exploration works for preparation of the Main Project for bypass canal for protection of the city of Strumica from external surface waters (2003-2004). (Client – “Balkan Consulting” – Skopje).
Geomechanical investigations and examinations for the preparation of the Main Project for the Regional Landfill “Zhupa” – Debar (2005). (Client – “Faculty of Civil Engineering” – Skopje).
Geomechanical investigations and examinations for the design of a thermal hospital within the camp of the German contingent in Prizren – Kosovo (2005). (Client – “GTZ” – Prizren).
Geotechnical investigation works for preparation of the Main Project for 400 KV transmission line “Shtip – Macedonian-Bulgarian border” and 110 KV transmission line “Shkodra” – Albania (2006). (Client – “EMO Institute” – Skopje).
Geotechnical investigation works for preparation of the Main Project for 400 KV transmission line “Bitola – Macedonian-Greek border” (2006). (Client – “DALEKOVOD” – Zagreb).
Geomechanical investigations and examinations for street design within the camp of the German contingent in Prizren – Kosovo (2006). (Client – “Ministry of Defense of the Federal Republic of Germany – DtEinsKtgt-KFOR” – Prizren).
Preparation of Elaborate for Coal Ore Reserves for bearing “Katlanovo” – Skopje (2006-2007). (Client – “EUROLIGNIT” – Skopje).
Preparation of the Basic Geological Map (OGK-2) of Macedonia with an interpreter for the ore region “Berovo-Delchevo-Pehchevo” (2007-2008). (Client – “Ministry of Economy” – Skopje).
Geotechnical investigations and field examinations along the route (35 km) and on locations of bridges and viaducts on corridor “K-8”, on sections: “Chatal – Strezovce” and “Strezovce – Romanovce” for preparation of geotechnical Elaborations at the level of Main Project (2008). (Client – “Prostor” – Kumanovo).
Geotechnical investigations and examinations of locations of bridges and viaducts on corridor “K-8”, on sections: “Kichevo – Trebenishta” for preparation of geotechnical Elaborations at the level of the Main Project (2008). (Client – “Prima Engineering” – Skopje).
Geomechanical investigations and examinations along the route of the highway “Veles – Katlanovo” and “Katlanovo – Veles” at the location of the embankments on which there are subsidence, for the preparation of a Rehabilitation Project (2008 – 2009). (Client – “Chakar-Partners” – Skopje).
Geotechnical investigations and examinations along the route of the railway “Kichevo – Kjafasan” (70 km) for the preparation of an Elaborate at the level of Preliminary Design (2009 – 2010). (Client – “Balkan Consulting” – Skopje).
Geological investigations and examinations along the routes for the gas pipeline system in R. Macedonia (950 km) for preparation of geotechnical Elaborates at the level of Study and Conceptual Projects (2009 – 2010). (Client – “Prostor” – Kumanovo).
Geotechnical investigations and examinations along the route of the railway “Dlabochica – D. Bair” (22 km) for the preparation of an Elaborate at the level of the Basic Project (2009 – 2010). (Client – “Balkan Consulting” – Skopje).
Geotechnical investigations and examinations at locations of 18 (eighteen) small HPPs for preparation of Elaborate at the level of Preliminary and Basic Projects (2010 and 2015). (Client – “AKVAVAT” – Skopje).
Geomechanical investigation and examinations for reconstruction and expansion of st. Teodosije Gologanov (2011). (Client – “Chakar-Partners” – Skopje).
Preparation of a Project for detailed geological investigation and examinations for preparation of OIGK and OHGK for sheet Veles 1: 100 000 and on OGK-2 sheet Plachkovica 1:50 000 (2012). (Client – “Ministry of Economy” – Skopje).
Geomechanical investigation and examinations along the route and at locations of road crossings, river and canal crossings, heating plant and reservoir, expansion vessels, pumping stations and electromotive distribution station (2014-2015). (Client – “ENERGO SYSTEM” – Skopje).
Geotechnical investigation and examinations of locations of viaducts, cuts, incisions, overpasses, tunnel and landslides from the road corridor “K-8”, section “Kichevo-Trebenishta” (2015-2017). (Client – “Granit (section: Kichevo-Podvis)” – Skopje, “Transmet (section: Podvis-Preseka)” – Skopje, “Victoria Invest (section: Pesochan-Trebenishta)” – Elbasan, Albania).
Geotechnical investigation and examinations of the dam “Konsko” with associated facilities, Kozhuf – Gevgelija (2017 – ongoing). (Client – “JV SERKA-AK-ELI, Tukey – (SERKA TAAHHUT INSH.AN, SHIR. / P., Turkey)”).