Kičevo – Ohrid motorway
Geotechnical investigations of the route and its landslides, piles and anchors, inclinometer monitoring and laboratory control on one of the most demanding sections of Corridor 8.
One route – 19 projects
The Kičevo – Ohrid motorway crosses some of the most geologically complex ground in North Macedonia: steep slopes, schists and active landslides. GHI has been working on the route for more than 15 years – from the first investigations through to construction and quality control.
We have worked for the contractors and designers on the route – Sinohydro, Granit, Ilinden, Transmet, Geoing MK and others. We investigated the viaducts, cuttings and landslides, installed reinforced concrete piles and self-drilling anchors, fitted inclinometers to monitor ground movement and load-tested the completed structures.
How we worked
Route and landslide investigations
Boreholes, field and laboratory testing at viaducts, cuttings and landslides – the basis for designing the structures and stabilising the slopes.
Stabilisation and foundations
Reinforced concrete piles, self-drilling anchors, rockfall protection mesh and drains – carried out with our own equipment and crews.
Monitoring and control
Inclinometers to track landslide movement, laboratory quality control and load testing of the completed structures.
All projects on the route (19)
Services involved in the project
Take a look at other projects
Konsko dam
Geotechnical investigations and reports for the dam and its ancillary structures, a site laboratory and quality control of every layer placed.
View the project →Otinja dam
Construction of the grout curtain for the embankment dam and its ancillary structures, and quality control testing of the materials placed.
See the projects on the map →Have a similar project?
Talk to our team about investigations, design and quality control.